SPECS

      

  • Wide Body..................................... 30 inches I.D.  front seat and rear seat
  • Wingspan........................................31 ft. 6 in.
  • Chord...............................................60"
  • Length..............................................20 ft. 0 in.
  • Height...............................................6 ft. 0 in.
  • Wing area........................................185 sq.ft.
  • Standard Engine............................55 HP air cooled
  • Empty weight..................................450 lbs.
  • Useful load.......................................575 lbs.
  • Ultimate load factor.......................+6 -4
  • Build time.........................................100-200 hours
  • Field assembly time.......................20 min.
  • Airframe  Aluminum tube (6061-T6, 2024-T3)
  • Steel, 4130 Chromoly, Stainless Steel pop rivets,
  • AN/Mil Spec. hardware.
  • Standard Covering: SUPERFLITE, FAA approved fabric.

PERFORMANCE:

  • VNE..............................................100 mph
  • Top level speed...........................95mph
  • Cruise speed................................90 mph
  • Stall speed....................................32 mph
  • Climb rate.................................1200 fpm solo, 700 ft. dual
  • Take off roll..................................96 fpm.solo, 196 ft. dual
  • Glide ratio.................................11:1 solo, 9:1 dual
  • Service ceiling.........................14,000 solo, 12,500 dual
  • Fuel used at cruise.................2 gph to 3 gph depending on your cruise speed.
  • Fuel capacity...........................10 gal. although you can add more tanks.
  • All data is based on average weight pilots, 180 lbs, and average sea level condition

"What do I have to do to complete the aircraft?"

Tail kit...attach a few hinges, cover with fabric, paint.


Wing kit...
attach a few hinges, attach the ribs, cover with fabric, paint.


Fuselage...
mount the engine, run wires to instruments, attach gear legs and wheels, brakes, etc., and then cover with fabric, and paint.

"Are there any parts to make?"  NO

"Is there any welding to do?"      NO

"Any critical holes to drill?"       NO


                       CUSTOMERS have been averaging 150-200 hours for first time builders !

FREE....   60 min. Video on DVD....FREE

  Letters from our Customers

  Differences Between Challenger and EXCALIBUR

  These Questions will help you decide ! !

Home    Articles   Contact Us   Engines   Factory 

Customer's Pics  FAQ    Photos   Price List   Specs